Free risk register template plus AI draft | readywhen

Free risk register template

A free risk register template with likelihood, impact, scoring and mitigation built in. Or let ready when surface the risks from your own contracts, threads and timelines, scored and ready for you to confirm.

Start free. No credit card.

A demo of readywhen drafting a risk register before a planning review: it reads client contracts and renewal dates in the inbox, checks supplier threads for slipping lead times, scans the delivery timeline in Notion for deadline chains, and drafts a nine-risk register with each risk scored likelihood times impact on a 1-to-5 scale.

Two proposed risks the owner had not logged (a client at 38% of revenue with an October renewal, and every job routing through one certified installer) are marked for confirmation, with a drafted mitigation for every amber and red risk.

What a risk register includes

A risk register is a living list of what could hurt the business or the project, with each risk scored, owned and answered . The point is not prediction; it is that nothing obvious blindsides you because nobody wrote it down. The settled column structure, which the template below follows:

Column What goes in it Notes
Risk What could happen, specifically “Ashworth renewal lost” beats “client risk”
Likelihood 1-5, from rare to almost certain Score honestly; optimism here defeats the register
Impact 1-5, from minor to existential Money, time, reputation, or all three
Score Likelihood × impact Drives the color and the priority
Owner Who watches this risk Unowned risks are unwatched risks
Mitigation What reduces likelihood or impact Name which of the two it reduces
Status Open / mitigating / closed Reviewed monthly or quarterly

How to score risk: likelihood times impact

Scoring keeps the register honest and the arguments short. Rate likelihood 1 to 5 (1 = rare, 5 = almost certain) and impact 1 to 5 (1 = minor annoyance, 5 = existential), then multiply. The product, 1 to 25, sets the color:

Green (1-6): monitor. On the list, reviewed on cadence, no action needed.

Amber (8-12): mitigate. Needs a named mitigation in motion, not just a note.

Red (15-25): act now. This risk gets attention this week, not at the quarterly review.

The multiplication matters because it separates the scary-but-rare from the mundane-but-certain. A supplier price rise that is almost certain (5) but minor (2) scores 10 and deserves more attention than the dramatic lawsuit that is severe (5) but rare (1) and scores 5.

Risk register example for a small business

Here is what a working register looks like for a small fit-out firm, scores and colors applied:

register-example.txt

R1 · Ashworth account (38% of revenue), renewal in October Likelihood 4 · Impact 4 · Score 16 · RED Owner: Priya · Mitigation: win 2 mid-size accounts by Sept (reduces impact); renewal conversation moved to August (reduces likelihood). Status: mitigating R2 · All installs route through one certified installer Likelihood 3 · Impact 4 · Score 12 · AMBER Owner: Priya · Mitigation: certify second installer by Q4 (reduces impact). Status: open R3 · Timber supplier lead times slipping (6→9 weeks this year) Likelihood 4 · Impact 2 · Score 8 · AMBER Owner: Dev · Mitigation: order at design sign-off instead of contract signing (reduces likelihood). Status: mitigating R4 · Van breakdown during install week Likelihood 2 · Impact 2 · Score 4 · GREEN Owner: Dev · Mitigation: hire cover pre-agreed with local firm. Status: open

Note what the scores do: the register does not treat every worry equally. One risk gets this week’s attention, two get named mitigations, one just gets watched. That triage is the entire value of scoring.

Free risk register template (plain text, Google Docs, Notion)

Three ways to a working register. The plain text pastes cleanly into Google Docs or Notion, or drops into a spreadsheet a column at a time.

The plain-text template

The full column structure with the scoring key built in.

risk-register-template.txt

RISK REGISTER · [Business or project name] Owner: [name] · Last reviewed: [date] · Cadence: [monthly/quarterly] SCORING Likelihood 1-5 (1 = rare, 5 = almost certain) Impact 1-5 (1 = minor, 5 = existential) Score = likelihood x impact Green 1-6 = monitor · Amber 8-12 = mitigation needed Red 15-25 = act now REGISTER ID: R1 Risk: [what could happen, specifically] Likelihood: [1-5] · Impact: [1-5] · Score: [L x I] Owner: [who watches this] Mitigation: [what reduces the likelihood or the impact] Status: [open / mitigating / closed] ID: R2 … (3-5 lines per risk. If a risk can’t be described specifically, it isn’t understood yet; that itself belongs on the register.)

Download .txt

Open in Google Docs

Duplicate in Notion

The AI prompt

Prefer to use your own AI? Copy this into Claude or ChatGPT with some context about your business, and it drafts a scored register.

risk-register-generator.md

--- title: Risk Register Generator description: A prompt that drafts a scored risk register for a small business or project, with likelihood, impact, owners and mitigations. author: readywhen source: https://readywhen.ai/risk-register-template homepage: https://readywhen.ai license: CC BY 4.0 (free to use and share with attribution to readywhen) version: 1.0 updated: 2026-07-17 keywords: [risk register template, risk log, project risk register, risk assessment] --- # Risk Register Generator _By readywhen. Full guide + free template: https://readywhen.ai/risk-register-template\_ You are drafting a risk register for a small business or project. Your job is not just to format risks the owner lists, but to propose the ones they have not written down: concentration risks, key-person dependencies, supplier and cash-timing exposures, deadline chains. ## Principles - Specific beats vague: "Coleman is 40% of revenue and their contract ends in June" beats "client risk". - Score honestly: likelihood 1-5 times impact 1-5. Green 1-6 monitor, amber 8-12 mitigate, red 15-25 act now. - Every risk gets an owner, even in a one-person business (then the register is really a review cadence). - Mitigations reduce likelihood or impact; name which. - 8-15 risks is a working register. 40 is a filing cabinet. ## What I need from you What the business or project does · key clients and roughly how concentrated revenue is · suppliers or platforms you depend on · deadlines and commitments in flight · who is irreplaceable · anything that already worries you. Ask me for what’s missing, then draft the register with proposed risks marked for your confirmation. --- _Made by readywhen. readywhen drafts your register from your own contracts, threads and timelines, and proposes the risks you haven’t written down. https://readywhen.ai/risk-register-template\_

Download .md

Let

ready

when

do it

Recommended

A blank grid still needs you to know your risks. ready when reads the renewal dates, supplier threads and deadline chains in your own tools, proposes the risks you have not written down, and hands you a scored register to confirm rather than compose.

The risks are already visible in your contracts, threads and timelines. ready when drafts a scored register from them in ~45 seconds , instead of the blank grid that has been on your list since January.

Let ready when surface and score your risks from your own tools

Every template on page one of Google hands you an empty grid and leaves the hard part (knowing your risks) to you. ready when starts from the evidence instead: the renewal dates in your inbox, the supplier threads with slipping lead times, the delivery chains in your Notion timeline, the one person every job routes through. It proposes the risks you have not written down, marks them for your confirmation, scores each one, and drafts a mitigation per amber and red. You review a started register, not a blank one.

Works with your existing tools

See all 1,400+ connectors

Risk register template FAQs

What is a risk register?

A living list of what could hurt your business or project, with each risk described specifically, scored for likelihood and impact, assigned an owner, and paired with a mitigation. Its job is triage: separating what needs action this week from what just needs watching.

What is the difference between a risk register and a risk log?

In small-business practice, nothing meaningful; the terms are used interchangeably. Some project methodologies treat the log as the running record of risk events and the register as the scored, managed list, but for most teams one document does both jobs.

How do you score risks?

Rate likelihood 1 to 5 and impact 1 to 5, then multiply. Scores of 1-6 are green (monitor), 8-12 amber (mitigation needed), 15-25 red (act now). The multiplication is the point: it ranks an almost-certain minor cost above a dramatic but rare catastrophe.

How many risks should a risk register have?

A working register for a small business runs 8 to 15. Fewer usually means concentration or key-person risks went unlisted; many more means categories are being logged instead of specific risks, and the register stops being read.

Is there a risk register template for Google Docs or Excel?

Yes. Copy the plain-text template on this page into Google Docs, Word or Notion, or download it as a file; the column structure also drops straight into a spreadsheet. All formats are free.

Can’t I just use ChatGPT or Claude to write my risk register?

Yes. Paste some business context and the prompt above, and you get a sensible starting register. ready when is the version that reads your actual contracts, threads and timelines, so it proposes the specific risks hiding there (the renewal date, the single point of failure) instead of the generic ones every business shares.

More templates for plans and ops

SOP

Standard operating procedures, written from how you already do the task.

Learn more

SWOT analysis

Strengths, weaknesses, opportunities and threats, drafted from your own context.

Learn more

Board report

The monthly pack: numbers, narrative and asks, drafted from your tools.

Learn more

See all templates

Stop keeping the risks in your head.

Draft your register free with ready when

About the author and editorial standards

About the author. Sançar Şahin is co-founder and CMO of ready when . ready when catches everything you say you’ll do and helps you move it forward: drafted, chased or flagged, ready when you are. He builds ready when in public on LinkedIn .

Editorial standards. No paid placements. The 1-5 scoring scale and green/amber/red thresholds reflect common risk-management practice (used across PRINCE2-style and government registers) rather than a single authority. How this page was made: Sançar built the multi-agent research and drafting system behind it, checks its work at several phases, and approves the final page himself. To flag an error, email hello@readywhen.ai .

Last updated: 19 July 2026.

Your risks, surfaced for you.

ready when proposes the risks hiding in your contracts and threads, scored and ready to confirm.

Start free. No credit card.

No one can stay on top of everything alone.

That’s what ready when is for.

Download .txt

Open in Google Docs

Duplicate in Notion

Download .md

Gmail

Notion

Slack

Google Calendar

Granola

Google Meet

See all 1,400+ connectors

SOP template

SWOT analysis template

Board report template

See all templates

Draft your register free with ready when

Sançar Şahin

LinkedIn